- Description: Problem Statement: Find the velocity of water in a sand aquifer between two monitoring wel...
-
Views: (773)
Duration: (00:03:15}
Uploaded: 11-03-11
- Tags: Groundwater, Permeability
- Comments - Responses: (0)
- Description: Problem Statement: Find the elevation of a point of intersection of two lines which are ta...
-
Views: (806)
Duration: (00:03:55}
Uploaded: 11-03-11
- Tags: Vertical Curves, Surveying
- Comments - Responses: (0)
- Description: Problem Statement: Find the stationing at a point along a horizontal curve when given the ...
-
Views: (902)
Duration: (00:03:51}
Uploaded: 11-03-11
- Tags: Surveying, Horizontal Curves
- Comments - Responses: (0)
- Description: Problem Statement: Find the peak stormwater runoff flow rate for 3 combined watersheds whe...
-
Views: (542)
Duration: (00:03:06}
Uploaded: 11-03-11
- Tags: Hydrology, Watershed, Runoff
- Comments - Responses: (0)
- Description: Problem Statement: Find the angle of internal friction of a soil sample, when provided the...
-
Views: (664)
Duration: (00:05:11}
Uploaded: 11-03-11
- Tags: Soil Strength, Cohesion
- Comments - Responses: (0)
- Description: Problem Statement: Find the primary consolidation settlement in a clay layer when provided...
-
Views: (1065)
Duration: (00:02:29}
Uploaded: 11-03-11
- Tags: Soil Settlement, Consolidation
- Comments - Responses: (0)
- Description: Level 9 Earthquake Resistance: diagonal bracing structure, light weight,
steel cons...
-
Views: (1404)
Duration: (00:02:11}
Uploaded: 12-11-10
- Tags: civil-engineering
- Comments - Responses: (0)
- Description: Reinforced Concrete Canopy Slab Calculation
-
Views: (1087)
Duration: (00:07:43}
Uploaded: 27-10-10
- Tags: Reinforced Concrete
- Comments - Responses: (0)